This map corresponds to a paper1 estimating the effect of groups of paved trails and protected bike lanes on bicycling in Atlanta. In that paper, we used a combination of Strava data and on-the-ground counters to measure bicycling and the generalized synthetic control method2 to estimate effects of the infrastructure on bicycling.
Figure 1 in the paper maps the infrastructure we studied and the corresponding treatment areas. Below is a similar figure mapped interactively to allow more detail to be seen.
Abbreviation definitions for treatment areas:
WST-PCG: Atlanta BeltLine Westside Trail & Proctor Creek Greenway
LS-TECH-IAP: Luckie Street NW Protected Bike Lane & Georgia Tech PATH Parkway & Ivan Allen PATH
EST-EXT: Atlanta BeltLine Eastside Trail Extension
PCT: South Peachtree Creek Trail
MCD: North McDonough St Protected Bike Lane
NT: never treated
Abbreviation definitions for treatment infrastructure:
WST: Atlanta BeltLine Westside Trail
PCG: Proctor Creek Greenway
LS: Luckie St NW Protected Bike Lane
TECH: Georgia Tech PATH Parkway
IAP: Ivan Allen PATH
EST-EXT1: Atlanta Beltline Eastide Trail: Krog St NE to Beltline corridor via Wylie St SE
EST-EXT2: Atlanta Beltline Eastide Trail: Irwin St NE to Edgewood Ave NE
EST-EXT3: Atlanta Beltline Eastide Trail: Wylie St SE to Kirkwood Ave SE via BeltLine corridor
PCT1: South Peachtree Creek Trail: Mason Mill Park to N Druid Hills Rd
PCT2: South Peachtree Creek Trail: Starvine Way to Clairmont Rd underpass
MCD: North McDonough St Protected Bike Lane
Copyright © 2022 Michael D. Garber